Our Executive Board has adopted the 2027 Water Authority Ordinance and the Flood Defenses and Water Safety maps. The updated regulations and accompanying maps (digital maps) will take effect on January 1, 2027.

The Water Board Regulations set forth the rules that HHNK follows to protect waterways, flood defenses, and roads. They are updated annually. Some of the changes are intended to clarify the rules. The changes for 2027 include:

  • When to provide compensation for land elevation; the new Section 2.1.28 includes a permit requirement for elevating parcels of land. The purpose of this is to preserve natural water storage capacity, prevent water being shifted elsewhere, and maintain the predictability of flood risks.
  • No mixing of discharge water with clean water; Article 3.3(2)(f) clarifies that the emission limit value must be based on undiluted wastewater.
  • Start/stop notification for groundwater withdrawals; a start/stop notification has been added to Article 4.4 to enable more targeted supervision .
  • Scope of in-channel maintenance: An area of operation has been added that includes the waterways for which HHNK is responsible for in-channel maintenance. This area of operation is taken into account when assessing the minimum required dimensions of culverts and bridges.
  • Distance of cables and pipelines from culverts and bridges; in Article 2.132(5), the minimum required distance between cables, pipelines, and service connections to be installed and culverts and bridges has been reduced to ensure more appropriate and workable standards.
  • Adjustment of the closed season period; the closed season period will be aligned with the period used by Rijkswaterstaat (October 1 – April 1). However, for the activity subject to a permit—seasonal beach structures—and the activity subject to a reporting requirement—grazing of animals—the period October 15 – April 15 will continue to apply.
  • Relaxations for Temporary Structures (on High Grounds); Articles 2.12 and 2.13 include a relaxation for temporary structures on flood defenses in areas designated as high grounds. For structures with a useful life of less than twelve months, general rules are sufficient, provided that the flood defense can be restored to its original condition upon expiration of that period.

Permit Requirements for Subdividing Lots

Following a careful public engagement process, the revised Water Board Regulation includes a permit requirement for the entire management area for raising the elevation of parcels of 4,000m²or larger by an average of 15 cm or more. This permit requirement ensures the preservation of natural water storage capacity, prevents water runoff, and maintains the predictability of flood risks. During extreme rainfall, it is inevitable that water will accumulate at ground level. The current water management system is not designed to handle this. Research shows that in recent years, land elevation—for example, due to residential construction or agriculture—has displaced 1.2 million m³ of water storage capacity, thereby increasing the risk of flooding for adjacent parcels. This is why HHNK has decided to implement a permit requirement.

Opinions

The draft resolutions for the 2027 Water Board Ordinance and the Flood Defenses and Water Safety Regulations were available for public review for six weeks. Fifty comments were received on the draft resolution for the Water Board Ordinance. Nearly all of the comments related, in whole or in part, to the topic “When to provide compensation in the event of land elevation.” This led to amendments to the 2027 Water Board Regulation: the application requirements for permit applications were added, and the explanatory notes were supplemented with information about the flood simulation models used.

In addition, in response to the comments received, it has been clarified that when implementing a compensatory measure, it is permissible to carry out the compensation entirely on one side of the watercourse, as long as it amounts to at least 30 cm on each side of the watercourse.

HHNK has also implemented a change of its own. The minimum water depth has been adjusted from 0.60 metre to 0.50 metre to align with the profiles in the “Wateren” register.