HomeCurrentWork in the neighbourhoodSchagenSchagenWind energy for the Geestmerambacht rwziTo make the treatment process more sustainable, we want to install one or two wind turbines at the Geestmerambacht rwzi. Geestmerambacht energy and resource plantThis project includes the construction of a central sludge digester with green gas plant. Callantsoog water system improvements.We are improving the water system to better manage a water overflow situation like the one in 2021 and to drain excess stormwater faster. MANABAS COASTWe are monitoring beach and dune dynamics. This paves the way for the implementation of Nature-based Solutions in the North Sea region. Catching moles on the dikeThere are moles in some places in our dikes. We have these trapped by a professional mole catcher for water safety reasons.